Top-Level To-Do List
This is the top-level to-do list for FLIGHT being ready for installation. Individual items often have their own issue entries, to track details.
Flyer mechanical
-
Top plates -
Motors -
Body acrylic -
Belts for motors -
Shafts for wings -
LED scepter -
Buck for body -
Finalize body attachment -
Bodies
Flyer electrical
-
Ethernet cables to flyers, at correct lengths based on flyer placement -
Head boards -
Tail boards -
Body LED strips -
Complete PC->headboard->tailboard signaling path -
Power budget analysis and verification
Software
-
Update FlightGUI to use more recent software package (either updated LXStudio or other software as recommended by Charlie) -
Linux USB ID mapping to /dev entries -
Firmware for USB ID enumeration, including compilation pipeline
Installation preparation
-
Build, paint, and test 3 mounting structures -
Mechanism to stop Flyer rotation -
Decide on final positions -
Order parts for full set of mounting structures -
Determine cable placement/tracking for each flyer
Edited by Philip A Levis